As part of the ongoing Surkhandarya CCPP Project, a total of three heavy cargoes—one 380-metric-ton STG, one 380-metric-ton GTG, and one 150-metric-ton ST—are being transported from the Port of Ersai to the project site.

The port transshipment processes at Haydarpaşa Port for this operation, conducted along a challenging 2,170-km transport route, have been successfully completed, and the cargo has arrived at Ersai Port. Transportation to the final destination via road is ongoing.

Çaba & Misnak manages all phases of the project—including route planning, obstacle removal, road improvements, infrastructure work, technical operations management, and specialized transport solutions—in a safe and controlled manner for the long-distance transport of high-tonnage equipment.

Contact
Çabamisnak | Surkhandarya-2 Combined Cycle Power Plant Project
Project Location Surkhandarya / Uzbekistan
Heaviest Load Ever Transported 380 metric tons (11.80 m long x 4.20 m wide x 4.76 m high)
Total Number of Axles in Use 84
Oversized Cargo 3

Key Features of the Project

International Long-Distance Shipping
Comprehensive Infrastructure and Culvert Reinforcement
Port Transshipment
Heavy Cargo Transportation

Gallery

Çabamisnak | Surkhandarya-2 Combined Cycle Power Plant Project
Çabamisnak | Surkhandarya-2 Combined Cycle Power Plant Project
Çabamisnak | Surkhandarya-2 Combined Cycle Power Plant Project
Çabamisnak | Surkhandarya-2 Combined Cycle Power Plant Project
Çabamisnak | Surkhandarya-2 Combined Cycle Power Plant Project
Çabamisnak | Surkhandarya-2 Combined Cycle Power Plant Project
Çabamisnak | Surkhandarya-2 Combined Cycle Power Plant Project
Çabamisnak | Surkhandarya-2 Combined Cycle Power Plant Project
Çabamisnak | Surkhandarya-2 Combined Cycle Power Plant Project
Çabamisnak | Surkhandarya-2 Combined Cycle Power Plant Project
Çabamisnak | Surkhandarya-2 Combined Cycle Power Plant Project

On the Site Come on..