Basra Refinery Modernization Project

SCROLL DOWN

We have successfully completed the logistics operations for the heavy and oversized (OOG) project cargoes we handled as part of the Basra Refinery Modernization Project in Iraq.

Thanks to our comprehensive operational planning, advanced engineering solutions, and robust equipment infrastructure, we successfully delivered these high-precision cargoes to their final destination in a safe and controlled manner.

The project was completed in less than 11 months, and the shipment and installation of 7 LPG tanks (bullets), 162 pieces of heavy equipment, and 99 modules were successfully carried out. Thus, the delivery and installation of a total of 268 pieces of equipment and modules were completed.

Contact
Çabamisnak | Basra Refinery Modernization Project
Project Location Basra, Iraq
Total Business Volume 1,065,274 FRT
Heaviest Load Ever Transported 890 metric tons (82.35 m length x 8.36 m width x 13.25 m height)
Total Number of Axles in Use 916
Oversized Cargo 260+

Key Features of the Project

High-Volume Industrial Shipping
Multiple Convoys
20,000,000 Safe Man-Hours of Work
Early Delivery
Hydraulic Axle and Fleet Management

Gallery

Çabamisnak | Basra Refinery Modernization Project
Çabamisnak | Basra Refinery Modernization Project
Çabamisnak | Basra Refinery Modernization Project
Çabamisnak | Basra Refinery Modernization Project
Çabamisnak | Basra Refinery Modernization Project
Çabamisnak | Basra Refinery Modernization Project
Çabamisnak | Basra Refinery Modernization Project
Çabamisnak | Basra Refinery Modernization Project
Çabamisnak | Basra Refinery Modernization Project
Çabamisnak | Basra Refinery Modernization Project
Çabamisnak | Basra Refinery Modernization Project

On the Site Come on..