Syrdarya-2 CCGT Project

SCROLL DOWN

As part of the Syrdarya-2 Power Plant Project in Uzbekistan, Çaba Misnak successfully carried out the heavy-haul transportation of turbines, generators, and transformers weighing up to 518 metric tons from Kazakhstan to Uzbekistan via road.

Given the complex geopolitical conditions and challenging logistical requirements, the engineering, route planning, transshipment, and heavy-haul transportation processes were meticulously managed, and the operations were completed safely, on time, and with a high degree of operational precision.

Contact
Çabamisnak | Syrdarya-2 CCGT Project
Project Location Syrdarya / Uzbekistan
Total Business Volume 6,600 FRT
Heaviest Load Ever Transported 518 metric tons (14 m long x 6.1 m wide x 6 m high)
Total Number of Axles in Use 540+
Oversized Cargo 22+

Key Features of the Project

High-Volume Industrial Shipping
International Long-Distance Shipping
Engineering-Based Bridge Bypasses
Comprehensive Infrastructure and Culvert Reinforcement
Multi-Convoy and Route Management

Gallery

Çabamisnak | Syrdarya-2 CCGT Project
Çabamisnak | Syrdarya-2 CCGT Project
Çabamisnak | Syrdarya-2 CCGT Project
Çabamisnak | Syrdarya-2 CCGT Project
Çabamisnak | Syrdarya-2 CCGT Project
Çabamisnak | Syrdarya-2 CCGT Project
Çabamisnak | Syrdarya-2 CCGT Project
Çabamisnak | Syrdarya-2 CCGT Project
Çabamisnak | Syrdarya-2 CCGT Project
Çabamisnak | Syrdarya-2 CCGT Project
Çabamisnak | Syrdarya-2 CCGT Project
Çabamisnak | Syrdarya-2 CCGT Project
Çabamisnak | Syrdarya-2 CCGT Project
Çabamisnak | Syrdarya-2 CCGT Project
Çabamisnak | Syrdarya-2 CCGT Project

On the Site Come on..